日韩欧美中文字幕在线精品,五月婷婷伊人网,人妻丰满熟妇无码,久久超级碰,國產尤物AV尤物在線觀看,美女国产在线,国产三级a,伊人的天堂
DEARTO-Professional manufacturer of temperature and humidity measuring instruments
Tai'an Detu Automation Instrument Co., Ltd.

0538-5089056

News Current position:Home > News

Thermal Knowledge | ?Second-class standard platinum resistance thermometers for calibration by the fixed-point method

Release time:2024-6-25    This article is read 2812 Times

Second-class standard platinum resistance thermometers are calibrated by first-class platinum resistance thermometer standard devices using the fixed-point method. The so-called fixed-point method, that is, the thermometer to be examined were placed in the water three-phase point, tin solidification point and zinc solidification point, measuring its resistance value, and then the results of the test and the last cycle of the test results, and then determine whether its stability meets the requirements.


1. The composition of the first-class platinum resistance thermometer standard device

① Standard device: a group of first-class standard platinum resistance thermometer, three, model WZPB-1.

② Calibration equipment: DC comparison ritual temperature bridge, the basic error 1 × 10-6R + 10 △ R (1Ω ≤ R ≤ 1000Ω), model QJ58; water three-phase point bottle and its insulation device; tin point furnace and its temperature control device, metal purity (by weight) of 99.999%; zinc point furnace and its temperature control device, metal purity (by weight) of 99.999%; platinum resistance furnace and its temperature control device. Temperature control device, in the placement of the temperature sensing element in the 100mm range of the axial maximum temperature difference does not exceed 1K.


2. Generation of three fixed points

2.1 Generation of water three-phase point

2.1.1 Water three-phase point

Water three-phase point temperature is a pressure of 610.615Pa in a sealed container, ice, water and saturated steam between the three-phase equilibrium temperature, which defines the value of +0.01 ℃ (273.16K), water, a phase equilibrium diagram shown in Figure 1. three-phase point of the water is not subject to the influence of atmospheric pressure, it is made out of the temperature can be maintained in a few months in the 0.1mK within the same.

圖片 1.png

Fig.1 An equilibrium diagram of water

2.1.2 Generation and preservation of water three-phase points

①Pre-cooling: before freezing, put the bottle of three-phase point in the thermos flask with crushed ice and water to pre-cool overnight, so that its temperature drops to about 1℃.

②Freezing: use cotton dipped in alcohol to scrub the thermometer insertion well of the three-phase point bottle clean, and no water should be left in the well. Repeatedly with cotton dipped in liquid nitrogen in the plug well to pull, so that the plug well around the formation of ice sets. At the beginning of the cotton less, pull the amplitude is small, try to make the bottom of the plug well around the first ice. To be thick enough ice (about 8mm), more cotton, pulling amplitude can be larger, so that the ice layer gradually lengthened, thickened. Ice thickness of 10mm can be. Freezing process should pay special attention to prevent the water three-phase point bottle liquid surface icing. Once the ice can be covered by hand, so that the ice melting.

③ Preservation: The water triple-phase point bottle is placed in a thermos bottle containing ice and water for preservation, the water at the bottom of the bottle is drained every day, crushed ice is added, and the mouth of the bottle is covered with an insulating material.

Water three-phase point bottle frozen after the first few hours, due to the growth of ice crystals or strain within the measured water three-phase point temperature rises faster, about a day and night after stabilization before use.


2.2 Generation of Tin Freezing Point

2.2.1 Metal cooling curve and thermopanel

In order to achieve the solidification point of the metal, the metal is generally first fully melted and then cooled down cooling curve (i.e., temperature and time relationship curve) is shown in Figure 2. which ABD part of the uniform liquid phase cooling process; horizontal part of the EC is the equilibrium phase transition process, at this time the temperature of the material is unchanged, the temperature on the line of the EC is the solidification temperature of the material; EC this period of time is the temperature of the time of the panel: BDE part of the equilibrium phase transition is said to have a supercooling phenomenon before BDE part that in the equilibrium phase transition before the phenomenon of subcooling, once the beginning of a large number of crystallization, the system temperature that is to return to the normal solidification point, the thermopanel appeared; CF part of the crystallization is completed, is a solid-phase cooling process.

圖片 2.png

Fig. 2 Metal cooling curve

2.2.2 Generation of the solidification point of tin

High purity tin solidifies with a large degree of subcooling (up to 20-30°C). In order to obtain a good temperature ping, must use a slow solidification called "external crystallization nucleation" of the induction technology, the specific operation process is as follows:

① Preparation: the tin point furnace and control cabinet connected to confirm the correct wiring; connected to the gas pipe and install a flow meter on top of it; will monitor the thermocouple into the tin point furnace thermometer inserted in the well, the thermocouple connected to the digital multimeter.

② Temperature control: thermostat given the value of 1.005mV, 60-segment programmable temperature controller curve in Figure 3, the actual value of the thermostat is 1.005mV plus a certain moment of the program given the value of the instrument. Figure 4 for the tin point furnace heating curve.

圖片 3.png

Fig.3 Programmable Temperature Controller Curve for Tin Point Furnace

圖片 4.png

Fig.4 Tin spot furnace heating curve

First 60-segment programmable temperature controller to go to the AB section in Figure 3, so that the tin is completely melted, the maximum temperature at the time of melting is about 20K higher than the solidification point of tin. Then 60 programmable temperature controllers go to Figure 3 in the BCD section, the furnace temperature control than the solidification point of tin 2-3K, maintained for 10min, during which the temperature change should not exceed 0.2K. Then 60 programmable temperature controllers go to Figure 3 in the DE section, so that the molten tin at a rate of 0.15K/min temperature reduction. When monitoring the value of the thermocouple down to the tin solidification point near (high 0.1K or so), start blowing nitrogen, nitrogen volume flow rate of about 15L/min. closely observe the value of the thermocouple, when it suddenly stops dropping and quickly back up, immediately stop blowing (blowing time of about 10min), observing the value of the thermocouple, to be back up to the temperature of the solidification point of tin near the thermocouple, remove the thermocouple, and then special stainless steel inducer bar Insert the special stainless steel inducing rod into the well, induced 1min after removal. At this time, the tin solidification point temperature ping appeared, the temperature is 231.928 ℃. Furnace temperature control than the solidification point of low 2K or so. Warm ping time of about 2h.


2.3 Generation of zinc solidification point

① Preparation: the zinc point furnace and control cabinet connected to confirm that the wiring is correct; will monitor the thermocouple into the zinc point furnace thermometer insert wells, thermocouple connected to a digital multimeter.

② Temperature control: thermostat given the value of 2.00mV, 60-segment programmable temperature controller curve in Figure 5, the actual value of the thermostat is 2.00mV plus a certain moment of the program given the value of the instrument.

圖片 5.png

Fig.5 Programmable temperature controller curve for zinc point furnace

First 60-segment programmable temperature controller to go to the AB section in Figure 5, so that the zinc is completely melted, the maximum temperature at the time of melting than the zinc solidification point of about 20K higher. Then 60 programmable temperature controllers go to Figure 5 in the BCD section, the furnace temperature control than the zinc solidification point of 2 ~ 3K, maintained for 10min, during which the temperature change should not exceed 0.2K. Then 60 programmable temperature controllers go to Figure 5 in the DE section, so that the molten zinc at a rate of 0.15K/min temperature reduction. When the monitoring thermocouple value stops falling and begins to rise, remove the thermocouple, the quartz tube induced rod inserted into the plug well, induced 1min and then removed. At this time the zinc solidification point temperature ping appeared. The temperature is 419.527℃, and the furnace temperature is controlled at about 2K lower than the solidification point. The thermopanel time was about 3.5h.


3. The second class standard platinum resistance thermometer checking

3.1 Test principle

Determination principle block diagram in Figure 6.

 

3.2 A second standard platinum resistance thermometer calibration steps

① water three-phase point generation: 24h before the test water three-phase point generation and save.

② Annealing: temperature sensing element for the quartz cross skeleton of the thermometer, the verification should be in the upper limit of the temperature 630 ℃ annealing 2h.

③ Measurement WSn: According to 2.2.2 to establish the tin solidification point temperature ping, measuring the inspected second-class standard platinum resistance thermometer RSn (platinum resistance thermometer into the tin point furnace, should be placed in the annealing furnace before preheating). Measurement of RSn and then put the thermometer indoors to cool down, measure the thermometer Rtp (measurement before the three-phase point of the bottle inside the melt, that is, in the three-phase point of the bottle insert well filled with water slightly higher than 0 ℃, rotate the bottle, so that the ice jacket rotation), the measurement results will be filled into the record table.

④ Measurement of WZn: Establish the zinc solidification point temperature ping according to 2.3, and measure the RZn of the inspected second-class standard platinum resistance thermometer (the platinum resistance thermometer should be placed in the annealing furnace to preheat before it is put into the zinc point furnace). Measure RZn and then put the thermometer in the room to cool down, and then measure the Rtp of the thermometer. fill in the measurement results in the record table.

⑤ Organize the test results: fill in the "second-class standard platinum resistance thermometer comprehensive results of the table", out of the certificate of verification, verification cycle of 2 years.


3.3 Precautions for calibration of a second standard platinum resistance thermometer

3.3.1 Temperature correction

QJ58 DC comparison ceremony temperature bridge measurement, and the bridge supporting the DC standard resistance must be immersed in transformer oil to maintain the resistance of the ambient temperature remains unchanged. QJ58 each time the readings are completed, you must measure the DC standard resistance of the ambient temperature, in order to do the platinum resistance of the measured value of the temperature correction.


3.3.2 Judging the availability of measured values

During the calibration of platinum resistance thermometers, a variety of judgments need to be made about various measurements to determine the availability of the measured values.


3.3.3 Avoiding external influences on the QJ58 bridge

Due to the high sensitivity of the photoelectric amplifiers fitted to the QJ58 bridge, a slight vibration or fluctuation in supply voltage will cause the detector pointer to wobble violently, making it impossible to read and easily damaging the bridge. Therefore, the location of the current detector should not be vibration, to avoid the use of the bridge in the period of supply voltage fluctuations may be large. If the detector pointer is found to be shaking violently or drastically, it should be stopped immediately.


Thermal Knowledge | ?Second-class standard platinum resistance thermometers for calibration by the fixed-point method
  • Online message

  • Your name
    Your title must be filled
  • Cellphone number
    Mobile phone number is required
  • whatsapp/wechat
    Optional
  • Type of consultation
    Required, please select the type of consultation
  • Consultation content
    Required, what is the content you want to consult?
  • Verification code: Please fill in the calculation result.
Previous:News | DEARTO New Invention Patent Certificate and Computer Software Copyright Registration Certificatenext:What can DTHTH high temperature & high humidity calibration chamber be used to do?

Contact us

DEARTO QR codeHeadquarter Address Tai'an High-tech Development Zone,  Shandong Province 
Telephon :+86 0538-5089056  +86 13953856217 
Fax : +86 0538-5059718 
After sale:+86 0538-5050959
Website : www.tadt.com.cn 
E-mail   :  tadtzdh@dearto.cn

Copyright? Tai'an Detu Automation Instrument Co., Ltd.             Lu ICP 14024757-1           Business license inquiry

主站蜘蛛池模板: 日本在线亚洲| 国内自拍久第一页| 中文字幕日韩欧美| 国产精品香蕉在线| 色AV色 综合网站| 欧美激情第一欧美在线| 91福利国产成人精品导航| 丝袜高跟美脚国产1区| 国产精品美女在线| 亚洲综合18p| 97久久免费视频| 亚洲色图另类| 国产一区在线观看无码| 国产网站一区二区三区| 精品亚洲麻豆1区2区3区| 国产97视频在线观看| 免费在线看黄网址| 狼友视频国产精品首页| 看你懂的巨臀中文字幕一区二区| 色偷偷男人的天堂亚洲av| 久久综合AV免费观看| 亚洲欧洲自拍拍偷午夜色无码| 国产国模一区二区三区四区| 免费不卡在线观看av| 亚洲天堂免费在线视频| 亚洲人成成无码网WWW| 午夜日b视频| 国产精品一老牛影视频| 天堂亚洲网| 国产毛片久久国产| 高清无码手机在线观看| 国产精品黑色丝袜的老师| 精品夜恋影院亚洲欧洲| 91小视频在线观看免费版高清| 亚洲婷婷丁香| 国产精品人莉莉成在线播放| 69av免费视频| 国产乱论视频| 国产精品第一区在线观看| 亚洲国产成人精品无码区性色| 丁香婷婷在线视频| 成年A级毛片| 欧美yw精品日本国产精品| 国产正在播放| 久久久久免费精品国产| 香蕉久久永久视频| 四虎影视国产精品| 亚洲无码37.| 国产精品尤物在线| 91丝袜乱伦| 成年人视频一区二区| 国产杨幂丝袜av在线播放| 国产成人喷潮在线观看| a网站在线观看| 亚洲av中文无码乱人伦在线r| 国产成人毛片| 久久国产精品麻豆系列| 国产毛片不卡| 国产成人一级| 久久永久免费人妻精品| 成人免费网站久久久| 国产极品美女在线观看| 亚洲成人动漫在线| 国产一级片网址| 2024av在线无码中文最新| 国产浮力第一页永久地址| 亚洲黄色片免费看| 99视频在线观看免费| 国产内射一区亚洲| 99性视频| 亚洲欧美日韩色图| 波多野结衣一区二区三区四区视频| 亚欧乱色视频网站大全| 国产精品视频999| 欧美a网站| 视频一本大道香蕉久在线播放| av午夜福利一片免费看| 精品第一国产综合精品Aⅴ| 在线欧美日韩国产| 国产精品思思热在线| 欧洲亚洲一区| 国产精品午夜福利麻豆|